Project Name:
Xinjiang 50,000 Nm³/day LNG Project
Project Location:Xinjiang
Products Involved:
This project relies on the owner's own coalbed methane(CBM) resources, and FURUI Energy Service is responsible for the EPC contract.
Project Introduction:
The civil foundation construction began in August 2022, and the project was located in the southern mining area of Fukang, Xinjiang, facing challenges such as remote location and inconvenient transportation. These difficulties were further compounded by strict pandemic controls during 2022–2023, leading to multiple full lockdowns. On August 10 this year, after the owner was ready for gas intake conditions, the project successfully produced LNG in just four days, achieving stable production by August 14.
Xinjiang 50,000 Nm³/day LNG Project
Products Involved: This project relies on the owner's own coalbed methane(CBM) resources, and FURUI Energy Service is responsible for the EPC contract.
Project Introduction:
The civil foundation construction began in August 2022, and the project was located in the southern mining area of Fukang, Xinjiang, facing challenges such as remote location and inconvenient transportation. These difficulties were further compounded by strict pandemic controls during 2022–2023, leading to multiple full lockdowns. On August 10 this year, after the owner was ready for gas intake conditions, the project successfully produced LNG in just four days, achieving stable production by August 14.
